TNT Roofing Systems
All property guides

Owner’s field guide · 02 / 05

Warehouses

Keep the loading bays open.

TNT / Guide 02

Which bays or processes must stay open through the repair?

Water over a loading lane presents a different problem from water over stored goods. Mark the affected bay on a floor plan and identify what has to keep moving during the work.

What to bring.

  • A roof or floor plan with dates, leak locations, and prior repairs marked.
  • The lease section identifying who controls roof work, plus any insurer requirements.
  • Actual stock damage and relocation invoices, with shift and delivery schedules.

Who to include

Include the facilities lead, property manager, and owner. Confirm who can authorize work if the tenant reported the leak.

Work window

Map staging and delivery lanes. Identify sensitive stock, ventilation intakes, and processes that cannot be interrupted.

Download the assessment overview PDF · 2 pages

Contact Ty

Where did you
first see water?

Send the property address, where the water showed up, and when it happens. Include any photos you already have.

[email protected]